Is an AI Data Center Restructuring Wave Coming?

Our base case: selective workouts, not a sector-wide wave. Data centers can be in short supply while their owners run short of cash. Watch for delayed rent, customer contracts that expire before the debt, and projects a buyer can’t take over intact.

Read the two-minute versionWeigh the evidenceSee the capital markets data

$2.9T Forecast global data center spending in 2025–2028, excluding power investment (Morgan Stanley Research)
1.4% Vacancy across CBRE’s eight primary North American markets in H1 2026 (CBRE market survey)
T+257 Average spread on five-year single-A data center ABS over the past three months, up from T+195 in Q1 2026 (CREFC data center weekly)
$44B SpaceX GPU financing that priced Nov. 19 and was upsized from $40B, with its largest tranche at 8.26% (IFR)

The briefing in two minutes

Bottom line: Our base case is selective workouts, not a wave. For creditors, what matters is who pays, when the cash arrives and what they can take over if a project stalls.

The market

  1. 01
    The debate We test six questions. Tenant demand is strong: space is nearly full and most new construction is already leased. The strain is in paying near-term debt and construction bills, and in the chance that one failure spreads to other lenders. Guarantees, older-chip values and AI efficiency gains point in different directions. Two readings of the same market
  2. 02
    Scenarios Our base case is rolling workouts: borrowers run short of cash one at a time. The trigger is usually late rent, a renewal on worse terms or a principal payment coming due. The bear case is a major customer or lender pulling back across many projects at once. Three ways it could play out
  3. 03
    Capital markets Financing is tightening unevenly. No data center asset-backed or commercial mortgage bonds (ABS or CMBS) priced in the three weeks to Nov. 13 (CREFC). A leading GPU cloud provider’s unsecured bonds trade at distressed prices. Secured deals with strong tenants still price, at wider spreads. Is the window closing?
  4. 04
    Why now The debt outlasts the contracts. Five-year GPU loans can rest on customer contracts that average about three years, and about half of Anthropic’s $900.9B in commitments falls after 2030 (prospectus). Short-lived assets, long-dated debt

How the deals work

  1. 05
    Structures The structure decides who takes the loss, across eight deal types from project bonds to GPU-backed loans. We also rank where the money to repay comes from, from signed leases to new money from the owners. Eight ways to finance the buildout
  2. 06
    Guarantees A promise to buy capacity is not a promise to repay principal. About $186.2B of Anthropic’s commitments can be cancelled or depend on conditions (prospectus). How good is a guarantee?
  3. 07
    Compute ecosystems A chip is worth what a buyer can run after a foreclosure. Some financing is circular, but the industry isn’t a closed loop. Not all compute is the same collateral
  4. 08
    Efficiency Cheaper AI can raise usage and still cut rents on last year’s chips. The efficiency question

When things go wrong

  1. 09
    How it could break Trouble starts before a missed payment: a tenant stumbles, power arrives late or chips lose value. When funding stops, cash can run short before the debt matures. How it could break
  2. 10
    Collateral Start with the cash being collected and the rights a lender can enforce. A working site may fetch more if power rights and leases transfer with it. What can a buyer take over?
  3. 11
    Cases Argo, Core Scientific, Cyxtera and Poolin show what kept running and what was sold. They don’t give a recovery rate for GPU loans. What the workouts saved
  4. 12
    What to watch Six signals, including Anthropic’s first credit ratings, would show whether distress is spreading. Six signals that would change our view
Primary-market construction 80.4% preleased, H1 2026 Data center market supply up 33.7% year over year, H1 2026 Used data center GPU index 83 in September 2026, down 13.3% year over year

Leasing and supply: CBRE primary-market survey. Used GPUs: American Compute’s November Rack Report.

01 · The Debate

Two readings of the same market

For each of six questions, we make the case for and against wider distress and say what would change our view. The markers show our judgment, not the odds of a default.

02 · Scenarios and the Bull Case

Three ways it could play out

Why workouts could stay isolated: the evidence in detail

Customers are signing leases and can help fund new capacity. A working site can also find another use. Those advantages matter only if the borrower can tap them and the creditor has a claim on the value they preserve.

03 · Capital Markets

Who financed the buildout, and how its debt trades

Data center financing expanded from REIT equity and mortgages to securitizations, GPU-backed loans and campus project bonds. As of Nov. 23, the deals and quotes we tracked show a tougher market for unsecured and high-yield borrowers. Some secured deals can still price, but the terms depend on the collateral and who stands behind the payments.

Market data as of: Nov. 23, 2026 for the window assessment and forward calendar. CREFC issuance data runs through Nov. 13. The bond table identifies each price date and distinguishes quotes from fund marks.

Is the window closing?Data center forward calendarFinancing timeline and issuanceWhere the debt trades nowSelected bonds and pricing

Is the financing window closing?

Our read as of Nov. 23: financing is tightening unevenly. Selected unsecured debt and high-yield refinancings show stress. Some secured transactions still price, even as data center securitization slowed. The evidence below is specific to data centers or AI compute, but it isn’t a complete market census.

Data center financing signals, last four weeksDifferent measures; do not add them together
SignalLatest readingWhat it tells lenders
Data center ABS and CMBS issuanceClosingNo deal priced for three straight weeks through Nov. 13. The last three months’ $4.1B is 48% below a year earlier; $21.9B year to date, down 13.1%The main refinancing exit for stabilized buildings has slowed: no deals priced in three weeks (CREFC data center weekly).
Data center ABS spreadsWiderFive-year single-A at T+257 on average over three months, against T+195 in Q1. EdgeCore’s Oct. 20 deal printed at T+325, the widest of 2026; Switch went from T+225 in March to T+290 in OctoberRepeat, stabilized issuers are paying 60–130 bps more than earlier this year (CREFC).
Private placementsCut backQTS cut a refinancing from about $800M to $300M on Nov. 13; its seven-year notes priced at +245 bps, against +170 bps six months earlierEven a Blackstone-owned operator took less money at a wider spread (Dow Jones via Fidelity).
High-yield project bondsShelvedOn Oct. 29, banks shelved a $5–7B bond sale for the Anthropic-leased campus in Hubbard, Texas. The bonds would have repaid part of a roughly $15B bridge loan. Texas had just put new projects on hold to assess grid risk. The bonds may be marketed in stages. Nebius also shelved a high-yield bond.The delay leaves bridge lenders exposed longer than planned. Reporting identified state power policy, not the tenant’s credit, as the trigger in Texas (ZeroHedge, reporting Bloomberg’s account; Finance & Commerce).
AI lab tenant creditSplitAnthropic raised about $100B in its IPO, including the greenshoe. Even so, bond-fund managers expect its first ratings to land in the BB range, below investment grade. About half of its $900.9B of commitments is expected after 2030A $100B equity raise doesn’t set the cost of debt. The rating will help price the leases and loans on projects built for Anthropic (WSJ; Anthropic’s prospectus).
Power and permitting policyTighteningTexas had already restricted new grid connections, and its governor-elect campaigned on pausing new data center approvals. Environmental permits resumed Nov. 18, but ERCOT’s energization pause continues pending its Dec. 10 findings (AP). Bonds backing Galaxy’s Helios campus, leased solely to CoreWeave, hit new lows on the newsPolicy can stall a financing even with a strong tenant. Barclays expects a slower, pricier buildout that favors sites with secured power (PitchBook LCD; PitchBook LCD, subscription required).
Bank loan salesWeak bidsING’s auction of about $500M of loans on a dozen data centers drew moderate demand by its Nov. 19 deadline. ING and SocGen are offering up to $800M of Oracle-project loans, with New Mexico expected near 85 centsBanks want to reduce exposure, and buyers are setting the price. A discounted buyer changes who sits at the table in a workout: check assignment limits, disqualified-lender lists and voting thresholds (Bloomberg; Futu).
Unsecured neocloud debtDistressed pricingCoreWeave 9.75% 2031 notes at 77.45 on Nov. 23, below their 52-week low, a 16.7% yield to worst and about 1,190 bps over Treasurys. Five-year default protection costs 22.5% of the amount insured up front, plus 5% a yearCoreWeave has said it won’t issue parent-level unsecured debt through 2027 (Capital IQ bond detail; Capital IQ CDS, subscription required).
Secured GPU loansHoldingCoreWeave’s $2.6B and $3.1B delayed-draw term loans quoted at 98.5 to above par on Nov. 12Investors price collateral and contracted cash flow apart from the parent (PitchBook LCD, subscription required).
Investment-grade-backed computeOpen, at a priceThe Saturn Funding Trust, about $44B for SpaceX GPUs, priced Nov. 19 and grew from $40B. Its largest tranche came at 8.26%, or +345 bpsLarge deals still clear if they pay investors well over the sponsor’s own debt (IFR).

Capital IQ prices are live quotes and evaluated marks, not trades. CREFC’s series covers U.S. data center ABS and single-asset data center CMBS through Nov. 13. It counts different deals than the Bank of America series in the chart below.

Data center forward calendarAnnounced or launched, not yet fully priced, as of Nov. 23, 2026
DealType and sizeStatus
CoreWeave (Meta contracts)Morgan Stanley, MUFGInvestment-grade delayed-draw term loan · at least $4BGuided at 7–7.5%. Was expected to launch as soon as the week of Nov. 16; not announced as of Nov. 22 (AI Stockwire)
Blue Owl · Amazon-leased Virginia campusCitiSingle-asset CMBS · $513MMarketing. Initial talk T+195 on the $375M AAA piece and T+260 on the $112M AA piece (Commercial Observer)
US Signal 2026-1/2Data center ABS · size not disclosedKBRA preliminary ratings Oct. 23; unpriced through Nov. 13 (CREFC)
QTSFive-year bank loan · $200MTo price, after the deal was cut from $800M (24 Top News)
Nexus · Anthropic-leased Texas campusMorgan Stanley-led groupHigh-yield bonds · $5–7BReportedly delayed by the Texas grid review. A staged sale is possible, but no pricing date is confirmed (ZeroHedge, reporting Bloomberg’s account).
Epoch Digital · MalaysiaSyndicated loan · $488MDelayed after the arrangers postponed the lender presentation (Capital Times)

A watchlist assembled from deal reports, not a complete issuance calendar. The proposed CoreWeave loan and marketed Blue Owl CMBS account for at least $4.5B in reported size; neither is counted as priced here. Delayed deals, downsizings and sales of existing loans are separate indicators, not amounts to add to the forward calendar.

What to watch next. Does the CoreWeave loan launch near 7–7.5%? Where does the Blue Owl AAA piece price against T+195? Does any data center ABS price before the holidays? What does ERCOT report on Dec. 10? Texas resumed environmental permits for data centers on Nov. 18. ERCOT’s pause on connecting new large data centers stays until its review is done, and the governor-elect has pledged a moratorium when she takes office in January (AP; Gibson Dunn). That timing matters for the Nexus bond sale.

How the market got here

Before generative AI, data center owners could already raise public equity and borrow against buildings and rents. AI added a second financing need: chips and servers that can age faster than a building. Large campuses also brought construction and tenant risk into project bonds. These markets now run alongside one another.

  1. Listed real estate

    Digital Realty went public as a REIT. Its early debt was mortgages and a bank line. Investors owned the buildings, not the equipment inside them (Digital Realty’s first results as a public company).

  2. Operating properties become bond collateral

    Vantage issued $1.125B of securitized notes in a deal it described as the industry’s first. Investors took exposure to a pool of operating facilities and tenant payments, not the operator’s balance sheet (Vantage’s issuance announcement; deal collateral and use of proceeds).

  3. 2021–22

    Securitization scales, then slows

    Tracked U.S. data center securitization rose to $9.7B in 2021, then fell to $1.3B in 2022 as financing costs rose. A growing infrastructure market doesn’t guarantee steady access to debt (CREFC, Exhibit 11A; Diamond Hill on the 2022 slowdown).

  4. 2023–24

    Private lenders finance GPUs

    CoreWeave closed a $2.3B facility backed by Nvidia chips in 2023 and signed an agreement for up to $7.5B of debt financing in 2024. The chip’s resale value and the timing of customer payments became underwriting questions in their own right (Reuters on the GPU collateral; 2024 facility terms).

  5. Listed neocloud equity and campus bonds

    CoreWeave priced its IPO in March at $1.5B gross including selling shareholders. In October, WULF Compute closed $3.2B of secured notes for Lake Mariner, while Beignet issued $27.3B of amortizing notes tied to Meta’s Hyperion campus. Equity in a GPU operator, secured notes at a project subsidiary and debt at a JV investor are three different claims (CoreWeave IPO pricing; WULF closing filing; S&P on Beignet).

  6. Lenders price renewal risk and counterparty risk apart

    CoreWeave closed a $2.6B delayed-draw facility at SOFR + 550 bps in August: debt maturity was about five years against customer contracts averaging about three. Later, S&P affirmed Beignet at A+ but turned its outlook negative after doing the same to Meta. One deal highlights re-leasing risk; the other shows how an anchor tenant’s credit can move the outlook even without a project default (facility closing disclosure; Beignet outlook review).

U.S. data center securitization issuance, 2018–2026

ABS and CMBS combined · USD billions · not limited to AI facilities

2018$1.13B
2019$1.35B
2020$2.18B
2021$9.74B
2022$1.27B
2023$9.71B
2024$11.58B
2025$26.28B
2026 YTDthrough Oct. 29$21.00B

One consistent series: Bank of America’s deal list as reproduced in CREFC’s November 2026 primer, Exhibit 11A. It excludes some privately placed series included in CREFC’s own totals and is broader than the S&P-rated ABS subset below. It does not count standalone project bonds, corporate debt or GPU loans. The 2026 bar is a partial year, not a forecast.

What changed for restructurings: The company that owns the site may not own the GPUs. The company paying rent may not be the one guaranteeing it. Trace who owns the asset and who owes the payment. A building can still have value when a shorter equipment loan or customer contract runs into trouble.

Where the debt trades now

In the Nov. 19 fund marks, four selected secured project bonds were closer to par than CoreWeave’s unsecured bond. The first APLD ComputeCo notes marked above par even though CoreWeave remained its long-term counterparty. That gap is consistent with investors distinguishing between project and parent debt. It does not isolate the value of collateral or establish borrowing terms for the sector.

Trade check. On Nov. 20, $648,000 face amount of the CoreWeave 2031 notes traded at 78.01 with a 16.49% reported yield (TRACE trade record as republished by Kilambi). By Nov. 23, Capital IQ quoted the notes at 77.45 mid, below their prior 52-week low. One trade or quote is not a closing mark or a recovery estimate.

Same-day comparison. Nov. 19 fund marks put CoreWeave’s bond at about 1,078 bps over Treasurys, versus 210–352 bps for four selected secured project bonds. These are comparable marks on the same day, not trades or a sector index (AI Stockwire’s bond snapshot; full bond table).

New-money check. Nebius reported a $775M loan at SOFR + 250 bps backed by deployed GPUs and contracted cash flows from an investment-grade customer (Nebius financing disclosure). That is pricing at origination for a specific collateral pool, not a current quote or an unsecured borrowing rate.

What the rating adds. S&P affirmed CoreWeave’s B+ issuer rating with a positive outlook in April, but rated its proposed 2031 unsecured notes B. In November, it affirmed the first APLD ComputeCo’s secured notes at BB− after construction finished. The agency still flagged refinancing risk. The project’s indirect access to Meta’s payments lasts about five years, not the full 15-year lease. After that, CoreWeave is the tenant. The tighter bond spread does not erase that risk (S&P on CoreWeave; S&P on APLD ComputeCo).

Selected bonds: origination and secondary pricingNov. 23 quote and Nov. 19, 2026 reference marks. Not a same-day comparison.
Bond and filingIssuedOriginal facePrice / $100YieldTreasury spread
CoreWeave 9.75% · 2031Corporate unsecured · includes $1.00B reopening · Nov. 23 quoteApr. 2026$2.750B77.4516.70%~1,194 bps
APLD ComputeCo 9.25% · 2030Secured · Polaris Forge 1Nov. 2025$2.350B103.038.35%+352 bps
APLD ComputeCo 2 6.75% · 2031Secured · Polaris Forge 2Mar. 2026$2.150B94.388.32%+348 bps
Cipher Compute 7.125% · 2030Secured · includes $333M reopeningNov. 2025$1.733B99.647.23%+239 bps
WULF Compute 7.75% · 2030Secured · Lake MarinerOct. 2025$3.200B102.746.93%+210 bps

Pricing dates and conventions: The CoreWeave row uses a Nov. 23 Capital IQ midquote (subscription required), with yield and Treasury spread to worst. All four secured rows use Nov. 19 fund marks compiled by AI Stockwire, with yield and Treasury spread to maturity. We could not verify newer like-for-like marks for all four secured issues. Neither a quote nor a fund mark is an executed trade. Yield to worst reflects contractual redemption scenarios, not default (FINRA’s yield guide).

Sample totals: $12.183B issued, of which $9.433B (77%) was secured. The sample excludes loans, convertibles, securitizations, guarantees and announced but unclosed deals.

Cross-check: Nov. 22 S&P Capital IQ Pro evaluated prices, yields and option-adjusted spreads showed the same relative ranking for CoreWeave 2031 and APLD ComputeCo 2 (subscription required). Evaluated prices are not trades, and option-adjusted spreads are not the Treasury spreads shown here.

Issuance in the selected bond sample

The five selected bonds account for $12.183B of original face amount, including completed reopenings. This is not total AI debt, incremental cash raised or principal still outstanding.

Selected bond principal by final maturity

Five series · USD billions at issuance

2030 · 3 secured series$7.283B
2031 · 2 series, one unsecured$4.900B

Totals use the filings in the bond table. The chart groups principal by final maturity; it is not a schedule of amounts due and does not allocate earlier amortization.

New U.S. data center ABS rated by S&P

Calendar-year issuance · USD billions

2024$3.90B
2025$9.25B

About 2.4× the prior year. The S&P data center ABS roundup also reports over $23B outstanding across 15 rated U.S. issuers as of March 31, 2026. This is a different universe from the five bonds and includes data centers beyond AI.

Other capital-market signals: ABS holders, rated deals, M&A and new loans
Other capital-market signalsDifferent measures; do not add them together
Market and sourceMeasureWhat it tells lenders
AI-related debt sales this yearInvestment-grade corporate bonds: ~$320B
Investment-grade data center and microchip debt: ~$230B
High-yield: ~$70B
Securitizations: ~$24B
Morgan Stanley data through Nov. 9 via the WSJ, rounded from its chart. Most AI debt went to investment-grade borrowers; the high-yield and securitization channels that are slowing are much smaller. Categories may overlap; don’t add them.
U.S. data center ABS>$23B outstandingS&P-rated balance at March 31, 2026, not annual issuance or all private debt.
Who holds U.S. data center ABS?About half held by U.S. insurersJune 2026 snapshot from S&P Market Intelligence (subscription required). In a workout, verify who holds each tranche and who can direct the trustee. This ownership estimate uses a different population and date from the March rated balance.
North American rated digital infrastructure32 rated transactionsS&P’s fourth-quarter roundup covers project finance, corporate debt and ABS. A count of rated transactions is not a count of projects financed across the whole market.
Data center M&A and investment transactionsNearly $39B in 2026 to dateReported in November, versus more than $69B for full-year 2025. Transaction value is not debt issuance or fresh operating cash.
Nebius GPU-backed loan$775M · SOFR + 250 bpsPricing at origination, secured by deployed GPUs and contracted cash flows. Not comparable to a fixed-rate bond yield.

For deeper underwriting, S&P’s AI chip financing research explains why hardware financings and building financings warrant separate analysis. Capital IQ’s Securities Screener and Research Library are useful for continued monitoring (subscription required); this briefing does not reproduce proprietary pricing or treat a screen as complete market coverage.

04 · Why Now, and How Much

Short-lived assets, long-dated debt

Financing a hyperscaler’s supplier is not the same as lending to the hyperscaler. If you lend to a project company or an independent GPU cloud provider (a neocloud), the hyperscaler buying the capacity may not owe you anything. The amounts at stake are large: BCG estimates the five largest hyperscalers allocated more than $800B to data center investment in 2026.

At Hyperion, S&P Global Ratings describes an initial four-year Meta lease and notes due in 2049. Separate agreements provide completion and residual-value support. CoreWeave’s $2.6B GPU facility runs about five years. The customer contracts backing it average about three.

The mismatch runs through tenants, too. Anthropic is less than six years old. It expects to spend $451.6B of its $900.9B in commitments by the end of 2030 and nearly all the rest from 2031 to 2045. That includes payments on five-year equipment leases (Anthropic’s prospectus; WSJ). Lenders to the projects and providers it pays are betting that its revenue grows into those payments.

The duration mismatch Asset or contract life Debt or lease obligation Exposed gap

Illustrative timing, not a cash-flow or recovery schedule. Sources: Quinn Emanuel on GPU economics; PSZJ on contracts and leases; CoreWeave’s DDTL 5.5 filing; CREFC on project bonds; and S&P on Beignet and Hyperion. The chart does not show rent renewals, guarantees or interim principal payments.

Borrowers can run short of cash before maturity

A maturity chart shows when debt comes due, not when the borrower first needs cash. To find that date, look at when rent starts, when principal payments begin, and how much cash a covenant breach could tie up.

The Federal Reserve puts advanced computing at about 31% of nonfinancial investment-grade corporate debt issuance through October 2026, up from less than 6% in 2023. This broad measure includes investment-grade tech issuers; it is not a count of debt issued by data center projects.

BloombergNEF identifies at least $1 trillion of debt maturing within five years across a broad group of companies involved in the buildout. The chart below covers a much narrower sample. Neither number is a forecast of defaults.

Selected neocloud and data center debt by legal maturity, $B

Silicon Lien’s filing-based sample groups reported principal by final legal maturity, including loans, project notes and convertibles. It uses a different borrower universe than BloombergNEF. It is not a schedule of cash payments: amortization, prepayments, conversions and new draws change the amounts due.

Where cash can run short before maturity

05 · Financing Structures

Eight ways to finance the buildout

The structure tells you who bears the loss when a project falls short. Select a deal type to see how it works, what the terms look like and what could go wrong.

    Where the money to repay comes from

    Lenders get paid from one or more of these sources, listed roughly from most to least dependable. Each can stop for a different reason.

    Sources of repaymentRanked by our judgment, not a credit rating
    SourceWhat can interrupt itWhat lenders check
    01 Rent under a signed leaseRent starts late, the tenant leaves or the renewal comes in lower. Losing the tenant can start a replacement period or cause an immediate default (CREFC).When rent starts, the tenant’s termination rights and whether the debt is still covered after the largest lease rolls over.
    02 Compute contractsThe contract can end before the loan does. CoreWeave’s five-year chip loan rests on customer contracts that average about three years (CoreWeave’s facility filing).What the next contract is likely to pay, not just the current one.
    03 Customer prepaymentsUsually paid once and spent on equipment. IREN’s Microsoft contract includes a 20% prepayment (IREN); Nebius said prepayments covered 50–60% of build costs on its Q2 deals (Nebius).Which company receives the cash, what it can be used for, and whether it is already counted elsewhere.
    04 Guarantees and backstopsThey pay only when their conditions are met. Nvidia’s SB Energy support, for example, waits for each building to be ready (Nvidia). Meta judged a payout on its residual value guarantees not probable at Sept. 30 (Meta’s Q3 filing).Whether it covers principal, who can make a claim and when it takes effect.
    05 Cash passed up from projects to the parentStops when a project fails a coverage test and its cash is held back (CREFC).Which company owes the debt and what cash reaches it.
    06 New loans or bondsDepends on markets staying open. The shelved bond sale for the Anthropic-leased Texas campus shows how a refinancing can slip (ZeroHedge, reporting Bloomberg’s account).Maturity dates, extension options and what happens if the refinancing slips.
    07 Selling the assetA running site with its power and leases sells for more than a half-built one or a pile of used chips. The mining workouts ended in site sales, returned machines and discounted payoffs (see the cases).Whether power rights, permits and leases transfer to a buyer.
    08 More money from the ownersVoluntary. Owners can decline to put in more, especially once their equity looks worthless.Any written commitment to contribute, and its limit.

    How to read it: A lease from a strong tenant ranks first only after rent starts. Until then, the project depends on construction funding and new loans (see how it could break). Count each dollar once: a prepayment that funded equipment can’t also repay the loan.

    Match the workout to the financing

    Open the quick reference: default triggers, collateral and remedies
    StructurePrimary default triggerKey collateralLikely restructuring path

    06 · Guarantees and Backstops

    How good is a guarantee?

    A promise to buy unused capacity is not a promise to repay principal. Read the contract: Who can make a claim? What triggers payment? Does the promise still hold if the building never opens?

    The tenant’s own contract can have the same gaps. About $186.2B of Anthropic’s commitments can be cancelled or depend on conditions before they start, such as the counterparty securing financing. Lambda missed a deadline to secure the facility for a $34.9B August agreement, so either side can now end it. Neither has given notice, and Anthropic says it doesn’t intend to (Anthropic’s prospectus). A signed contract with a strong tenant can still depend on the developer hitting its own milestones.

    The guarantee web: who stands behind whom

    Select a company to trace the disclosed arrangements shown here. Caps, lease values and equity investments measure different things; do not add the figures to estimate expected payouts.

    The guarantee ladder, from a lender’s point of view

    Strength ratings show how directly, in Force 10’s view, each form protects a lender.

    Six questions to ask of any backstop

    07 · Compute Ecosystems

    Not all compute is the same collateral

    Rival platforms use different chips and software. When you value a fleet, ask who can run those chips and who would buy them in a foreclosure. The original price won’t tell you either.

    Seven ecosystems, ranked by how easily the hardware moves

    Meters are Force 10’s qualitative assessment. Resale depth reflects the pool of third-party buyers for the hardware; software portability reflects how easily existing AI workloads run on the platform.

    What it means for lenders

    Follow the money

    Is the AI buildout circular?

    Some financing is circular. The industry is not a closed loop. Households and businesses pay for AI. Public filings don’t show how much of that cash reaches each borrower, or whether it arrives in time to pay for what’s being built.

    Three ways money enters the buildout
    Operating revenueHouseholds and businesses
    AI apps and labs Cloud, chip and site providers

    Customers pay for subscriptions or usage, directly or through a cloud marketplace. Labs then buy compute, and operators pay for equipment, space and power. The marketplace is a route to the buyer, not a second source of demand.

    Internal fundingEstablished tech businesses
    Cash from existing products funds capacity

    Advertising or other established operations can support an AI build. That cash is not new AI revenue. For example, Alphabet reports Search and Cloud separately, and Cloud includes both AI and non-AI services.

    FinancingInvestors, lenders and suppliers
    Equity and debt pay for equipment and buildout

    Outside investors can bring in fresh cash without creating customer demand. Supplier funding can feed back into sales for the supplier. A guarantee supports borrowing but is not cash unless it pays out.

    Conceptual flows, not a dollar map. Sources: Alphabet’s Q3 segment disclosure, Anthropic’s preliminary prospectus and the Fed on circular finance.

    A documented loop: Amazon and Anthropic
    AmazonAnthropic

    $5B investment announced in April, with up to $20B more tied to milestones.

    AnthropicAWS

    More than $100B of AWS spending committed over ten years.

    Two sides of the April 2026 agreement, not equivalent cash flows. The announcement does not trace investment dollars to individual AWS bills. Amazon announced a similar pairing of equity investment and AWS commitments with OpenAI.

    One lab, two sources of cash

    Anthropic · Nine months ended Sept. 30, 2026 · USD billions

    Net cash from operations$6.6B
    Net cash from financing$110.7B

    Anthropic’s filed prospectus, cash-flow statement. Operations generated net cash, not gross receipts or free cash after infrastructure investment. Receivables and deferred revenue affect timing; some equipment prepayments sit in investing cash flow (prospectus cash-flow detail). The bars don’t measure the circular share.

    What disputes the “all circular” claim. OpenAI reported more than 50 million consumer subscribers in February, separate from its fundraising announcement. Anthropic reported $33.2B of revenue in the first nine months of 2026 and names companies outside the infrastructure supply chain, including insurer Travelers, as customers. Neither disclosure shows exactly what unaffiliated customers paid in cash, net of credits and subsidies (OpenAI’s subscriber disclosure; Anthropic’s filed revenue; Travelers deployment).

    What confirms the financing risk. Anthropic raised about $100B in its November IPO, including the underwriters’ greenshoe option. That is financing, not sales. The IPO shows money also comes from outside investors, not only strategic partners. It doesn’t prove that revenue from customers can pay for the build (Anthropic’s closing announcement).

    The lender’s test: Trace cash from the ultimate payer to the specific borrower. Strip out unused credits and undrawn commitments, count customer prepayments once, and put sponsor support in a separate scenario. Then ask whether collections after operating costs cover rent, capex and debt service when due if no new capital arrives. A dollar of customer spending can appear in revenue at several companies; don’t count it more than once as new demand.

    08 · The Efficiency Question

    Cheaper AI can lift usage and cut rents on older chips

    Customers can use more AI and still pay less to rent last year’s chips. Test both outcomes: how much usage grows and what customers will pay when the fleet comes up for renewal.

    Sector forecasts can account for compression and optimization. The IEA’s High Efficiency case assumes bigger gains from software, hardware and facilities for the same demand for digital services. That doesn’t tell us what an individual project has budgeted. Before counting the savings, ask for the workload mix, tested throughput and the number of racks and megawatts the project would need.

    Then ask which workloads would move to newer chips, what the old fleet could still run at a profit, and whether the building can house the replacement. Even in a growing market, a borrower may have to cut rents or retrofit a hall.

    Modeled efficiency curves (log scale)

    The historical lines apply published efficiency rates at a constant pace. They don’t plot observations. From 2026 on, the spending estimate starts with assumed growth in work at the same capability. It then divides by the modeled gain from cheaper computing and better algorithms. It holds the workload mix fixed and treats the two gains as independent. The workload assumptions don’t come from observed frontier training FLOPs. The result doesn’t forecast chip purchases, power use or actual spending.

    TrendHistorical rateWhat it measures

    A newer rack can have a cost advantage without making the older one worthless. Nvidia claims up to a 10-fold reduction in inference cost per token for Rubin versus Blackwell on selected workloads. That is a vendor comparison, not a forecast of used-chip prices or rents.

    Where inference efficiency comes from

    What efficiency means for the collateral

    09 · Default Pathways and Exposure

    How it could break

    A project can be in trouble before it misses a payment. These three examples show how. The contracts determine when a default occurs, which remedies apply and whether it triggers a default elsewhere.

      Economic spillover is not a legal cross-default. A tenant shortfall can pressure multiple landlords and their lenders even if no agreement links their defaults. The Federal Reserve’s financial stability review highlights shared counterparties and circular financing as paths for losses to spread.

      If the funding stops

      A funding shutoff rarely ends in an immediate default. It plays out in stages, and it moves fastest when cash is owed before a building earns rent. What happens first depends on which source of money stops.

      Construction advances

      The sponsor still owes interest and build costs before rent starts. Many construction loans come due once the building is finished. The sponsor must refinance before the building has a track record, which is a second funding test (ArentFox Schiff).

      GPU delayed draws

      Draws depend on equipment and contract conditions. A lower appraisal can shrink the borrowing base and require cash or collateral while customers still use the fleet (Linklaters).

      Refinancing

      With the $5–7B bond sale for the Anthropic-leased Texas campus shelved (see Capital Markets), banks hold the $15B bridge loan longer (ZeroHedge, reporting Bloomberg’s account). A delayed bond sale is not itself a payment default. If the bridge comes due without repayment or an agreed extension, the failure to pay can trigger a default under the loan documents.

      Customer prepayments

      IREN’s Microsoft contract includes a 20% prepayment. If expected cash is late or unavailable to the entity paying for equipment, that entity still needs another source of funds. Check when payments are due, who receives them and how they can be used.

      Backstops

      Backstops that start building by building, such as Nvidia’s SB Energy support, don’t fund a stalled build (Nvidia’s CFO commentary).

      1. Stage 1

        Cash gets trapped

        Coverage tests and other triggers can redirect cash to principal before the borrower misses a payment (CREFC). Distributions stop, and holding-company lenders lose their source of repayment.

      2. Stage 2

        The cure clock starts

        Waivers, amendments and sponsor equity requests follow. Each creditor’s rights now matter more than the headline backlog.

      3. Stage 3

        The structure picks the workout

        Options run from extensions, exchanges and debt-for-equity swaps to equity foreclosure, a servicer workout or Chapter 11 with a Section 363 sale (PSZJ).

      4. Stage 4

        Collateral is tested

        A half-built site with restricted power rights, or GPUs sold piecemeal, recovers far less than a running cluster sold as a going concern. The mining workouts ended in discounted payoffs, returned machines and site sales (see the mining cases).

      5. Stage 5

        Stress spreads, or doesn’t

        If one anchor customer or lender pulls back across projects, more assets reach the market while bidders face the same funding limits. The Federal Reserve points to shared counterparties and circular financing as channels (Fed financial stability review).

      Where it stands in November: The clearest evidence is in refinancing delays, such as the shelved Texas campus bond sale, and in loan-sale demand. It is not a broad freeze in committed construction draws. ING’s auction of data center loans drew moderate bids (Bloomberg). Neither the delay nor the auction shows a missed payment.

      Our read: Expect one borrower at a time, not a sector-wide stop. A shutoff across several projects at once is our bear case and would move us toward correlated stress (see scenarios).

      Who bears the loss?

      One missed payment can leave creditors with different rights. Use these questions to check yours before the deadline to fix a default starts running.

      10 · Collateral

      What can a buyer take over?

      Start with the cash a buyer can collect and the rights a lender can enforce. Then compare the value of keeping the site running with the proceeds of selling the assets piece by piece, after carrying costs, sale costs and any required consents.

      What cash survives distress?

      Start with collections, not contract value. Verify when billing begins, what the customer pays, and what can reduce or stop payment: missed delivery milestones, service credits, offsets or termination rights. Subtract power, cooling, staffing and maintenance costs to see what is left before debt service.

      Follow the cash to the right entity. Identify who invoices the customer, where receipts are deposited, and who has a lien on the receivables or control of the account. Check the order in which cash is paid out and whether the lease, service contract and payment rights can transfer to a buyer.

      Value the backstop on its own. A customer’s parent may guarantee specified rent. A capacity purchase promise or a residual-value guarantee covers a different loss. Check who can enforce it, what triggers payment, the cap, how soon cash arrives, and whether the right survives a sale or change of control. Never count the same rent twice. See the guarantees chapter.

      One operating site, three payment outcomesHypothetical figures, in USD

      Assume a site bills $1M a month and costs $0.4M a month to keep open. If the tenant stops paying, assume it pays nothing for the first year and replacement rent starts in month 13 at $1M a month. In the guarantee case, assume an enforceable parent guarantee that transfers to the buyer and pays $0.7M a month for that first year, on time.

      Tenant pays

      $7.2M first-year operating surplus

      The site collects $1M a month. No operating shortfall. Illustrative operating cash-flow value: $27.0M.

      Tenant stops; guarantee pays

      $3.6M first-year operating surplus

      The guarantor pays $0.7M a month in place of rent, not on top of it. No operating shortfall if payments arrive on time. Illustrative operating cash-flow value: $23.6M.

      Neither pays

      $4.8M first-year operating funding gap

      With no receipts, someone must fund $0.4M a month to keep the site open. Illustrative operating cash-flow value: $15.7M, assuming it stays open and re-leases as modeled.

      How to read the values: Present value of 60 months of month-end operating cash flow at an assumed 1% monthly discount rate. The estimate excludes terminal value, re-leasing costs, capital spending, taxes and debt service. These figures show how payment risk can change a buyer’s starting point, not an appraisal or a lender recovery estimate. Lender recovery also depends on priority, enforcement costs and the rights that transfer.

      GPU residual value, % of new price Third-party model ranges

      American Compute’s June 2026 conservative residual model, shown for 2027–2029. These are modeled percentages of new price, not executable bids, liquidation estimates or recoveries on loans. Value a specific fleet by configuration, condition, location and sale process.

      Meters are Force 10’s qualitative assessment of value held in distress and ease of transfer, informed by the sources cited on each card.

      Why build cost is not recovery value

      Force 10’s relative judgments assume a buyer can put the site back to work. A restricted power assignment or unsuitable fit-out can reverse the ranking.

      11 · Restructurings and Precedents

      What the workouts saved

      An AI customer filing, an unfinished campus sale and a miner restructuring tell us different things. Use the cases to test what can be kept running or transferred, not to estimate a recovery rate on a GPU-backed loan.

      Site sale and refinancing

      Argo kept operating at Helios

      Argo sold the site, refinanced asset-backed loans and signed a hosting agreement with the buyer for its mining machines. Selling a site need not mean shutting it down (Argo’s closing announcement). Argo restructured again in 2025, when noteholders and a new lender took 97.5% of the equity (Argo’s 2025 closing filing).

      Debt converted to equity

      Core Scientific reduced debt

      The company reported $400M of debt reduction through conversions by equipment lenders and convertible noteholders. Debt reduction measures what came off the balance sheet, not the cash creditors received (Core Scientific’s emergence announcement). By Sept. 30, 2026 it was billing 485 MW of colocation capacity across its portfolio (Core Scientific’s Q3 2026 filing).

      Operating assets and real estate

      Cyxtera found a buyer for the business

      Brookfield bought the operating business and, in a separate deal, the real estate at seven sites. The operating asset purchase price does not value those properties or any one creditor’s claim (Cyxtera’s transaction filing).

      What the cases teach

      Miners to AI: what the mining workouts left behind

      Helios and Core Scientific show how a powered mining site can find a new use. Conversion still takes firm power, cooling and connectivity. A contract for megawatts is not the same as a site that can bill for them.

      Argo sold Helios to Galaxy for $65M in 2022 as part of a refinancing. Galaxy delivered 133 MW of critical IT load to CoreWeave in the first phase in 2026, distinct from 200 MW of gross power.

      Financing a landlord is different from financing a GPU cloud. Galaxy’s Phase II notes fund construction at a leased site. Under its Microsoft agreement, IREN supplies GPU cloud capacity and procures the chips. Both deals have customers, but they put the risk of falling chip values in different hands.

      AI and data center share of revenue, quarter ended September 30 2025 2026

      Rounded shares of each issuer’s reported revenue: Core Scientific colocation, IREN AI cloud (2025 services; 2026 services and leases) and TeraWulf HPC leasing. Definitions differ; the chart shows a change in reported revenue mix, not comparable margins.

      Selected leasing and cloud deals

      CompanyTenantCapacityTermValueModelNote

      Where the conversions could break

      12 · What to Watch

      Six signals that would change our view

      Our base case is selective workouts, not a wave. These indicators would show first whether distress is spreading beyond specific borrowers, or whether the bull case is holding.

      Force 10 Partners

      Plan for the first liquidity shortfall

      Force 10 Partners advises debtors, creditors and fiduciaries in restructurings and other special situations. On an AI infrastructure project, we start with three questions. Which company runs out of cash first? Who controls the assets? What can be sold or refinanced before the next deadline?

      What we deliver in the first 30 days

      1. 13-week cash flow. Show when each project company runs short of cash, not only the group, and what could block a draw or trap cash.
      2. Collateral and rights map. Trace the liens on power rights, land, chips, contracts and equity, and which can transfer without consent.
      3. Valuation. Compare going-concern, re-lease and liquidation cases net of carrying costs, retrofits and consent risk.
      4. Stakeholder strategy. Bring in the tenants, utilities, hyperscalers, chip vendors and lenders whose decisions the plan depends on.
      5. CRO and sale execution. Provide independent leadership to manage liquidity and run a sale, refinancing or Section 363 process while operations continue.
      • Debtor financial advisor
      • Chief restructuring officer
      • Creditor and committee advisor
      • Distressed M&A and 363 sales
      • DIP and rescue capital
      • Valuation and solvency opinions
      Force 10 Partners

      5271 California Ave., Suite 270
      Irvine, CA 92617

      949 357 2360
      contact@force10partners.com

      Start a confidential conversation
      Key terms used in this briefing

      Debt markets and pricing

      ABS
      Asset-backed securities: bonds repaid from a pool of leases or other payments, rather than by the company itself.
      CMBS
      Commercial mortgage-backed securities: bonds repaid from mortgage loans on specific buildings.
      Investment grade and high-yield
      Credit ratings of BBB− and above are investment grade. Ratings below that, such as BB− or B+, are high-yield, often called junk.
      Secured and unsecured debt
      Secured debt is backed by specific collateral, such as a building or chips. Unsecured debt relies only on the borrower’s promise to pay.
      Tranche
      One slice of a bond deal. The AAA tranche is paid first and carries the lowest yield.
      Par and yield to worst
      A bond priced at 100 trades at face value. Yield to worst is the lowest yield an investor can earn if the bond is repaid early or called.
      Basis points (bps)
      Hundredths of a percentage point. 100 bps equals 1%.
      T+195, T+257
      The spread over Treasurys. T+195 means 1.95 percentage points above the comparable Treasury yield.
      SOFR
      The benchmark rate behind most floating-rate loans. SOFR + 550 bps means 5.5 percentage points above it.

      Loans and deal structures

      Holding company and project company
      The parent versus a separate company, sometimes called a ComputeCo, SPV or joint venture, that owns one project and borrows against it.
      Delayed-draw loan
      A loan the borrower draws in stages, often as equipment arrives or conditions are met.
      Bridge loan and take-out
      A short-term loan meant to be repaid by a later bond sale or long-term loan, called the take-out.
      Mini-perm
      A short loan that funds construction and must be refinanced soon after the building is finished.
      Coverage test (DSCR)
      A check of whether cash flow covers debt payments. Failing it can hold back cash before any payment is missed.
      Residual value guarantee
      A promise to cover the gap if an asset is worth less than an agreed floor when the lease ends.

      Data centers and AI

      MW and GW
      Data center size measured by power. 1 GW equals 1,000 MW.
      Hyperscaler
      One of the largest cloud companies, such as Amazon, Microsoft or Google.
      Neocloud
      A newer company that rents out AI chip capacity, such as CoreWeave or Nebius.
      Colocation
      A landlord that rents space, power and cooling to many tenants in one building.
      Energize and interconnection
      Connecting a site to the power grid. The utility or grid operator, such as ERCOT in Texas, must approve it before a site can run.
      Key sources and how to read the figures

      Links alongside the claims identify the supporting reports, filings or transaction documents. Market quotes are dated observations; forecasts and the efficiency sensitivity are not observed outcomes. Ratings and the base case are Force 10 judgments, not implied odds.

      1. CBRE: North America Data Center Trends, H1 2026
      2. Federal Reserve: Financial Stability Report, November 2026
      3. BloombergNEF: Financing Compute
      4. CRE Finance Council: Data Center Primer, November 2026
      5. CRE Finance Council: Data Center New Issue Weekly, Nov. 16, 2026
      6. CoreWeave: Q3 2026 Form 10-Q
      7. S&P Global Ratings: Beignet and Hyperion credit review
      8. Nvidia: Filed CFO commentary for the quarter ended Oct. 25, 2026
      9. International Energy Agency: Key Questions on Energy and AI

      Briefing cutoff: November 23, 2026. Transaction examples are not predictions of default by the companies named. This briefing is for general information and is not investment, legal or accounting advice.